Short answer
To claim for hidden defects in a home bought from a private individual there are, as a general rule, six months from the handover of the keys (art. 1490 of the Spanish Civil Code); if the home is a new build or is in Catalonia, or if the defect is very serious, the time limits can be considerably longer.
Second-hand home bought from a private individual
- Warranty against hidden defects: six months from handover, a strict time limit that is not interrupted by sending a burofax. It allows you to seek the rescission of the sale or a reduction in the price.
- Breach of contract: five years when the defect makes the home uninhabitable or unfit for its use, such as structural failure or damp that makes it impossible to live in.
- Wilful misconduct: if the seller knowingly concealed the defect, for example by painting over damp before the viewing, the contract can be annulled within four years, in addition to compensation.
New-build or refurbished home (licence applied for from May 2000 onwards)
The Spanish Building Act (art. 17) makes the developer, the builder and the technical professionals liable for damage that appears within:
- Ten years: structural damage (foundations, columns, beams, floor slabs, load-bearing walls).
- Three years: habitability defects, such as damp, water ingress, thermal or sound insulation and healthiness.
- One year: finishing defects, for which the builder is liable.
The periods run from the acceptance of the works. Once the damage has appeared, there are two years to claim (art. 18 LOE). In the case of structural damage there is also compulsory ten-year insurance.
Homes in Catalonia
The Catalan Civil Code replaces hidden defects with lack of conformity. The defect must become apparent within two years of handover and be notified to the seller without undue delay. The action becomes time-barred three years after the buyer knew, or could have known, of it.
What to do as soon as you detect the defect
- Document it with dated photographs.
- Notify the seller or the developer in writing (burofax).
- Commission an expert report that proves its origin and how long it has existed.
- Attempt the compulsory prior negotiation (MASC) and, if there is no agreement, file the claim.
As the six-month period is very short, every week counts. At DPCON, with lawyers and expert architects, we study which time limit is still open in your case and we act throughout Spain.
Updated on 13 October 2026.
This answer is general information and is no substitute for advice on your specific case.
You may be interested in: Judicial claim
Are you in this situation?
Tell us briefly about your case and we will let you know whether we can help.
Other questions that may help you